York Resonate

York Resonate

York Resonate Project Description  As part of the route upgrade works in and around York, there were several interventions that required changes to be made to the York Integrated Electronic Control Centre (IECC) workstations. As the control system in York IECC was...
Severn Tunnel

Severn Tunnel

Severn Tunnel Project Description  ADComms was contracted by Network Rail Telecom to work with them and Mobile Network Operator, EE, to modify the existing Severn Tunnel radio infrastructure by designing and installing a Neutral Host Distributed Antenna System. The...
Off Grid Power / Renewable Energy

Off Grid Power / Renewable Energy

Worlaby Project Description ADComms was tasked to engineer an innovative solution capable of providing dependable power for a GSM-R site with a challenging geographical profile. Work Streams Water main presence – Discussion and Site visit with Water Board to define...
Heathrow Express Tunnel

Heathrow Express Tunnel

Heathrow Project Description Heathrow Rail is the principal rail connection between the UK’s principal airport and Central London. It is seen as a key asset by the airport operator, Heathrow Airport Ltd (HAL), and their major Airline customers. With the increased...
Durham Railway Station

Durham Railway Station

Durham Railway Station Project Description ADComms was asked to install Panasonic IP cameras with analytic capabilities, across the station, commuter platforms and car park, replacing the existing IP cameras. Work Streams Replace existing CCTV cameras with upgrades...